The Asian Development Bank (ADB) has approved two concessional loans worth a total of $468 million to improve water and agricultural management in Pakistan, the bank announced on Friday.
The larger share of the package, $260 million, will fund the Integrated Hill Torrent Management Project in Punjab. The project will build water retention, drainage and flood-protection structures in Dera Ghazi Khan and Rajanpur districts, where seasonal hill torrents regularly damage crops and homes. It will also expand spate irrigation, which channels floodwater onto farmland, and use nature-based solutions to capture seasonal flows for groundwater recharge and community water use.
The second loan, worth $208 million, will support the Khyber Pakhtunkhwa Resilient Irrigated Agriculture Livelihoods Development Project. It will rehabilitate and extend irrigation canals in Nowshera, Swabi and Upper Chitral districts, introduce modern water-management and smart farming techniques, and provide livelihoods training, with specific measures to increase women’s participation in water governance.
According to the bank, the two projects are expected to benefit about 728,000 people in the two provinces. They aim to protect rural communities from climate change, floods and water scarcity, raise agricultural production and strengthen food security.
ADB Country Director for Pakistan Emma Fan said the projects would make a significant contribution to food security while addressing the mounting environmental pressures and the effects of climate change on farming communities, according to the bank.
The financing comes as Pakistan’s agriculture sector faces growing strain from water shortages, erratic rainfall and flood damage. The bank said the investments are also expected to strengthen provincial disaster preparedness, raise crop yields, support rural jobs and provide more reliable water supplies for farms, communities and ecosystems. Officials say better water management is central to protecting harvests in districts where farming depends heavily on canal water and seasonal rains.
In Khyber Pakhtunkhwa, the project work includes rehabilitation of the Pehur Main Canal, construction of the Mulkhow Irrigation Distribution System and an extension of the Pehur High Level Canal, according to the federal Planning Commission, which considered the project in October.

Leave a Reply